Vionix Consulting
Stabilising and modernising critical software systems
German software architect in Bangkok, helping teams bring slow reporting, overloaded databases, and fragile core modules back under control. Reliable. Efficient. Direct.
Services
What We Improve
Database & Reporting Performance
Shorten runtimes, stabilize batch windows, and remove reporting bottlenecks.
Incremental System Modernisation
Move high-risk flows to safer seams with measurable stability gains.
Efficient Team & Workflow Enablement
Increase release predictability with practical review and handover routines.
About
How We Work
Operator model with explicit boundaries
Vionix runs short, constraint-led diagnostic engagements that establish baselines, prove a safe improvement path, and transfer operational ownership back to your team.
-
Baseline before opinions
Measure runtime, batch window pressure, locks, deadlocks, regression frequency, and dependency hotspots before planning changes.
-
Proof over persuasion
Prototype 2-3 critical flows early to validate feasibility and expose hidden constraints before larger implementation effort.
-
De-risk delivery and handover
Use parallel validation, explicit rollback paths, and practical guardrails, then transfer ownership via walkthroughs, templates, checks, and training.
Week 1 outcome: a concise brief (baseline + bottlenecks), a prioritised plan, and one validated first-slice recommendation with risk controls.
Good fit
- Slow reporting, overloaded databases, and lock-heavy data paths.
- Fragile revenue modules with high regression risk and unclear ownership.
- Delivery blocked by dependency sprawl, release pressure, or offline constraints.
Not a fit
- Generic staff augmentation with no explicit system outcome.
- Greenfield MVP builds that do not require production continuity controls.
- Rewrite-everything mandates or cosmetic refactors without operational goals.
Engagements
How We Engage
Choose the engagement that matches current risk and delivery pressure. Each option produces concrete outputs and a clear next decision.
Engagements are typically principal-led. Additional specialists join only when explicitly scoped. The goal is measurable system outcomes and a clean handover to your internal owners.
1-Week Assessment
- Baseline runtime, batch window pressure, lock contention, and failure modes.
- Map constraints, dependencies, and the highest-risk execution seams.
- Deliver a prioritised backlog and one validated first-slice recommendation.
Implementation Sprint (2-4 Weeks)
- Implement the first high-impact slice with measurable improvement targets.
- Add guardrails, rollback paths, and production-safe rollout sequencing.
- Leave a clear rollout plan for the next slices and ownership handover.
Enablement / Clinics
- Harden review and release workflow with practical templates and checkpoints.
- Raise onboarding speed and handover quality for high-change modules.
- Increase release predictability through repeatable ownership routines.
Team
Our Expert Team
Stefan
Founder & Principal Consultant
Ruthairat
Co-Founder & Director Quality EngineeringContact
Get in touch
Address
Soi Sukhumvit 72
Sam Rong Nua, Mueang Samut Prakan
Samut Prakan 10270
Thailand
Phone
Email Us
Business Hours
Monday - Friday: 9:00 AM - 6:00 PM
UTC+07:00, Bangkok time